CenterPoint Energy Houston Electric, LLC, (CenterPoint Energy) has proposed a new transmission line affecting landowners in Harris, which was approved in May of 2015. The 138-kilovolt (kV), double-circuit line will run between Franz Corner and Zenith Substation. CenterPoint Energy believes Read More …
CenterPoint Energy Houston Electric, LLC, (CenterPoint Energy) has proposed a new transmission line affecting landowners in Harris and Grimes Counties. The 345-kilovolt (kV) line, which will potentially run from the Zenith Substation in Harris County to Gibbons Creek Substation in Read More …
Texas Central Railway is the private entity that is planning and funding the environmental study for the Texas Central High-Speed Railway from Dallas to Houston. The high speed rail is anticipated to provide a 90 minute commute between two of Read More …
Entergy Texas, Inc. (“ETI”) will be building a single pole, single circuit 230 kV transmission line from the Ponderosa Substation (near Conroe, Texas) to the Grimes Substation (near Shiro, Texas). The line will be approximately 39 to 47 miles long Read More …
The Texas Transportation Commission has approved a Texas State Highway (SH) 249 extension, known as the Aggie Expressway, from Farm to Market Road (FM) 1774 at FM 149 in Pinehurst to FM 1774 at Todd Mission. The road received its Read More …
College Station has been a hub for growth in recent years, and this growth has triggered the development of several large-scale infrastructure projects that will require the use of eminent-domain to reach fruition. In an effort to help educate local Read More …
The Blumenthal Substation and 138-kV Transmission Line Project was filed with the PUC on October 31, 2014. A substantial number of landowners have interacted in the review process and the project is still waiting for final approval (PUC Docket No. Read More …
Electric Transmission Texas, LLC (ETT) and Sharyland Utilities, LP will build a 345-kilovolt (kV) transmission line from the North Edinburg Substation to the Loma Alta Substation. The construction of this line will affect land owners in Hidalgo and Cameron County. Read More …
The La Joya Relief Route (US 83) is a proposed project in Hidalgo County. TxDOT reports, “The proposed project consists of constructing a four-lane controlled access expressway facility within a usual 350 foot wide to a maximum 450 foot wide Read More …